WHAT IS THE REAL PROJECT STATUS? HOW ARE THE PROJECT FUNDS BEING USED? IS THE PROJECT COMPLETED ACCORDINGLY?
Project Monitoring
Erection and Production Survey
Manufacturing Survey
Installation Survey
Specifications Verification
Commisioning Survey
When you are a thousand miles away from a project you are financing you need to be be sure that it is executed accoridng to contract specifications and local regulations.
When you decide to disburse funds you need to be sure that the project is really on-track.
We offer a wide range of services helping you to monitor the progress of a project. We provide you timely and accurate project status information enabling you to take knowledgeable decisions.
Project Monitoring
SGS issued reports and release notes can be used to release bank payments.
Back to top
Erection and Production Survey
- Monitor the manufacturing of main suppliers
- Monitor erection and installation of key components
- Attend relevant test activities
- Report failures detected during tests and propose measures to prevent/correct
Back to top
Manufacturing Survey
- Initial audit of the facilities, the manufacturing processes and quality procedures
- Periodical inspections of main equipment manufacturers and subcontractors
- Verification of documentation related to materials and components
- Verification of calibration reports and measurements of the manufacturer
- Welding procedures and welder certificates
- Verification of tools and machine certificates
- Checklist revision and non conformity detection and monitoring
- Verification of any incident that may occur during the manufacturing process
- Issue of a Manufacturing Certificate
Back to top
Installation Survey
- Initial audit of the project site
- Periodical inspections, including but not limited to:
- Installation Manual revision
- Civil works progress
- Equipment delivery and installation
- Issuance of an Installation Certificate (if applicable)
Back to top
Specifications Verification
Verification of equipment and manufacturer:
- Track record
- Fitness for the site (related to site-specific external conditions)
- Review of equipment design
- Certification status
Back to top
Commissioning Survey
Commissioning surveys include verification of procedures for initial start-up and testing after installation, to confirm proper, safe and functional operation of all devices, controls and apparatus, e.g:
- Safe start-up
- Safe shutdown
- Safe emergency shutdown
- Functional tests
- Proper records are kept for testing, commissioning, control parameters and results
- Issuance of an Installation Certificate and Final Acceptance Certificate
Back to top
|